Over the years, Grunau’s process piping team & Grunau Metals have fabricated and installed various test stands and production test lines for the manufacturer of flow measurement and control products. One of the more recent oil test stands at Badger Meter’s Racine, WI facility is pictured below in both the Grunau designed BIM version, as well as the completed installation.

Grunau Location: Wisconsin Office

Owner: Badger Meter

Contractor: Grunau Company

Completed: November 2013

Grunau Metals fabricated and installed structural steel and specialty metals for this new 5-story, cave-like auditorium that seats 11,400 near Madison. Railings and trimwork throughout the building interior and exterior showcase Grunau’s talents.

Grunau Location: Wisconsin Office

Owner: Epic Systems

Contractor: JP Cullen & Sons

Architect: Cuningham Group

Completed: September 2013

Grunau Metals fabricated and delivered a new 8,616 sq ft centrifuge deck and compaction deck consisting of massive stainless steel beams which Grunau sourced from Switzerland. Grunau took extra precautions to ensure there was no cross-contamination from carbon steel to stainless steel since the decks were going into a corrosive industrial environment.

Grunau Location: Wisconsin Office

Owner: Basin Electric Power Cooperative

Engineer: BARR Engineering

Completed: July 2013

Grunau upgraded the heating and ventilation system at this Madison VA hospital. To avoid jeopardizing current research projects at this medical facility, Grunau was given a 24-hour window to shut down the old and start the new equipment. With coordination, preplanning, and innovative thinking, Grunau completed the final tie-ins and exchange within 10 hours.

Grunau Location: Wisconsin Office

Owner: US Dept of Veteran Affairs

Contractor: C3T

Architect: Chequamegon Bay Engineering

Engineer: Henneman Engineering

Case Study: WI | Veterans Hospital Project Case Study

Completed: June 2013

Grunau Metals fabricated the steel framing for the new pedestrian bridges in Grant Park. The project was part of the Seven Bridges Trail along the Milwaukee lakefront. Read the full “The Story of Seven Bridges” in our Cutting Edge section of our Grunau News Blog.

Grunau Location: Wisconsin Office

Owner: Milwaukee County Parks System

Completed: March 2013

Grunau’s Milwaukee personnel traveled to Louisiana to complete this job which goes to show we can be successful anywhere with our experience and ability to pre-plan. Our techs installed a Batchmaster furnace, Temper furnace, 3 Quench tanks, plus a Gantry crane at this manufacturing plant.

Grunau Location: Wisconsin Office

Owner: Halliburton Energy Services

Engineer: Surface Combustion

Completed: January 2013

Installed HVAC, plumbing, and fire protection in Time Warner Cable’s offices in June 2001. In September 2011, recommissioned HVAC equipment and installed a comfort network system for better energy savings. In December 2012, Grunau prefabricated piping to efficiently install a new chiller system on the roof.

Grunau Location: Wisconsin Office

Owner: Wisconsin Electric

Contractor: GPD/Gilbane

Architect: Eppstein Uhen

Engineer: Grunau Company

Completed: December 2012

Grunau’s Electricians installed a 47-foot wind turbine for Milwaukee Area Technical College to ocmplete their portfolio of renewable energy sources at their South Campus. Grunau’s Underground Utilities crew laid the utiltiies and concrete foundation to support the wind turbine. Read more in the case study below.

Grunau Location: Wisconsin Office

Owner: Milwaukee Area Technical College

Case Study: MATC South Wind Turbine ~ Oak Creek Case Study

Completed: October 2012

Full electrical remodel of older building into a new appliance and electronics store. Lighting, electrical boxes, outlets, and cables/lines.

Grunau Location: Wisconsin Office

Owner: hh gregg

Completed: August 2012

Grunau assembled and installed a Renewgy wind turbine at Werner Electric Supply’s headquarters in Madison, WI. Grunau’s work included electrical and underground utilties to complete the project. Read more in the case study below.

Grunau Location: Wisconsin Office

Owner: Werner Electric Supply

Contractor: Grunau Company

Case Study: Werner Wind Turbine ~ Madison Case Study

Completed: July 2012

For over 35 years, Grunau designed and installed mechanical and fire protection systems in new construction and store remodels throughout Southeastern Wisconsin, including plumbing at the new 135,000 sq ft store in Brookfield, WI.

Grunau Location: Wisconsin Office

Owner: Target Corporation

Completed: July 2012

Installed rooftop 60’x60′ thermal solar system with 56 panels to generate power to heat the jail’s domestic water (approximately 3,000 gallons used per day). Grunau Metals fabricated and installed the support skeleton while our Plumbers installed the new hot water solar system. Read more in the case study below.

Grunau Location: Wisconsin Office

Owner: Waukesha County Dept of Public Works

Engineer: Angus Young

Case Study: WI| Waukesha County Jail Project Case Study

Completed: September 2011

Installed new chiller to keep the temperatures refrigerated in the penguin exhibit. Read the case study below for more details.

Grunau Location: Wisconsin Office

Case Study: Milwaukee County Zoo, Penguin Exhibit ~ Brookfield Case Study

Completed: June 2011

As a licensed Focus on Energy solar panel installer, Grunau installed solar panels, inverter, solar panel racking, meter, and all conduit and wiring for a complete solar photovoltaic system into an existing electrical service. Electricity produced utilized for mechanical equipment plus lights and general electric load.

Grunau Location: Wisconsin Office

Owner: Milwaukee County

Completed: January 2011

Maintenance and repair services and spring/fall seasonal changeovers for HVAC equipment at over 90 US Army Reserve Centers in the Five-state Great Lakes Region (Minnesota, Wisconsin, Indiana, Michigan, Ohio)

Grunau Location: Wisconsin Office

Owner: US Army

Contractor: Nuvo Construction

Testimonial: “Your integrity and ability as a respectable mechanical company has been exhibited thoroughly. Nuvo Construction Company offers sincere appreciation to Grunau Company for their hard work, timeliness, and extension of services above and beyond what was required.” ~ Scott Farina, Project Manager, Nuvo Construction Company

Completed: December 2010

Installed a drain-back type solar hot water system for this Milwaukee County park building

Grunau Location: Wisconsin Office

Owner: Milwaukee County

Completed: November 2010

Solar Photovoltaic Array system installed on roof of 20,000 sq ft office to convert sunlight into usable electricity; Grunau Corp HQ received LEED EB Gold rating in 2009. Read more in the case study below.

Grunau Location: Wisconsin Office

Owner: Grunau Company, Inc.

Case Study: Solar Photovoltaic at Grunau Headquarters ~ Oak Creek Case Study

Completed: November 2010

BIM, HVAC, Plumbing, Medical Gas, Structural Metals, Temperature Controls, and Underground Utilties completed on this new construction 520,000 sq ft hospital, orthopedic clinic, and medical office building. The medical complex achieved a LEED Silver NC rating.

Grunau Location: Wisconsin Office

Owner: Aurora Health Care

Contractor: Mortenson Construction

Architect: Albert Kahn Associates

Engineer: KJWW Engineering

Case Study: Aurora Medical Center ~ Grafton Case Study

Completed: October 2010

Upgraded HVAC in Naval Reserves Drill Hall in Peoria, IL

Grunau Location: Wisconsin Office

Owner: US Navy

Contractor: Lakeview Construction

Completed: June 2010

Marquette relied on Grunau’s design-build expertise for HVAC, plumbing, and fire protection in their new 300,000 sq ft law school, Eckstein Hall, which obtained a LEED Silver NC rating.

Grunau Location: Wisconsin Office

Owner: Marquette University

Contractor: Opus

Architect: Opus Architects & Engineers

Case Study: Marquette University Law School ~ Milwaukee Case Study

Completed: June 2010

Geothermal heat pump system install with 8 each 350-feet deep wells, pipe headers and system air distribution

Grunau Location: Wisconsin Office

Owner: Marshall & Illsey

Contractor: BCI – Bukacek

Completed: March 2010

Design/Assist, HVAC, Plumbing, Underground Utilities and Specialty Metal Fabrication for a new state-of-art 802,000 sq ft medical facility encompassing a hospital, clinic, pharmacy, and the Vince Lombardi Cancer Center. Read more in the case study below.

Grunau Location: Wisconsin Office

Owner: Aurora Health Care / Hammes

Contractor: Mortenson Construction

Architect: Albert Kahn Associates

Engineer: KJWW Engineering

Man-Hours: 235000

Case Study: Aurora Medical Center ~ Summit Case Study

Completed: January 2010

Structural and specialty metals fabrication for condominiums along the Milwaukee Riverwalk

Grunau Location: Wisconsin Office

Owner: River Renaissance LLC

Contractor: VJS Construction Services

Architect: Engberg Anderson

Man-Hours: 11672

Completed: January 2010

Installed Geothermal exchange system consisting of 272 each 300-feet deep wells, 2 underground vaults, associated piping and trenching / backfilling at world headquarters office which now has a LEED Platinum certification

Grunau Location: Wisconsin Office

Owner: Johnson Controls

Contractor: Hunzinger Construction

Architect: Gensler

Engineer: Affiliated Engineers

Completed: October 2009

Grunau used BIM technology for this HVAC & Plumbing new construction project. The building obtained a LEED NC Silver Rating.

Grunau Location: Wisconsin Office

Owner: Marquette University

Contractor: Opus Group

Completed: September 2009

Structural & Grunau Metals, Plumbing, Specialty Metals Fabrication, Underground Site Utilities for a new parking structure and campus renovations

Grunau Location: Wisconsin Office

Owner: Alverno College

Contractor: Gilbane Building Co.

Architect: Uihlein Wilson Architects

Completed: September 2006

Grunau completed HVAC for the hospital’s rooftop conservatory as part of St Luke’s new healing garden. The garden counts towards the medical center’s LEED certification points.

Grunau Location: Wisconsin Office

Owner: Aurora Health Care

Contractor: M. A. Mortenson Company

Architect: Brubaker

Completed: June 2009

Recommissioned HVAC equipment and updated comfort network system on headquarters building in Waterford, WI

Grunau Location: Wisconsin Office

Owner: Runzheimer International

Contractor: Berghammer

Engineer: Grunau Company

Completed: March 2009

Sheet metal stair wells, steel beam restaurant tables and seating, outdoor features and a metal ramp to display motorcycle models are among the specialty metals work that Grunau Metals fabricated in this museum for the famous motorcycle icon of Harley Davidson. Watch our “Grunau Metals Fab Shop” video on our Grunau YouTube channel highlighting some of the metal features at the museum.

Grunau Location: Wisconsin Office

Owner: Harley Davidson

Contractor: M.A. Mortenson

Architect: HGA

Engineer: Pentagram Architecture

Completed: May 2009

Grunau installed a high expansion foam (HEF) fire protection system in the aircraft hangar of this military base in Milwaukee

Grunau Location: Wisconsin Office

Owner: Wisconsin National Guard

Contractor: Nuvo Construction

Case Study: WI | Aircraft Hangar Project Case Study

Completed: April 2009

Grunau decommissioned, repaired and reconstructed Strattec’s environmental test chamber when the equipment was moved from their Michigan-based plant to its facility in Juarez, Mexico.

Grunau Location: Wisconsin Office

Owner: Strattec

Case Study: Strattec Refrigeration ~ Michigan to Juarez, Mexico Case Study

Completed: April 2009

Plumbing and Medical Gas completed in a new 12-story tower with 96 patient rooms and 72 intensive care units. Grunau used BIM on this Design/Assist hospital project to complete on an efficient and agressive construction schedule. Read more in the case study below.

Grunau Location: Wisconsin Office

Owner: Childrens Hospital of Wisconsin

Contractor: Boldt Construction

Architect: Shepley Bulfinch Richardson and Abbot

Engineer: Ring & DuChateau

Man-Hours: 38699

Case Study: Childrens Hospital of Wisconsin West Tower Expansion ~ Milwaukee Case Study

Completed: March 2009

Installed a geothermal heat pump system for the City of Milwaukee with 12 each 230-feet deep wells, pipe headers, and system air distribution

Grunau Location: Wisconsin Office

Owner: City of Milwaukee

Completed: December 2008

HVAC, Plumbing, Fire Protection for healthcare clinic

Grunau Location: Wisconsin Office

Owner: Advanced Healthcare

Contractor: Midwest Design & Development

Architect: Midwest Design & Development

Man-Hours: 8378

Completed: December 2008

Recommissioned HVAC equipment and installed a “Trane Delivered VAV” system to the existing stand-alone system in this Madison, WI office building

Grunau Location: Wisconsin Office

Owner: Stevens Construction

Completed: November 2008

Grunau designed and installed HVAC, Plumbing, and Fire Protection systems for this design/build remodel that included academic and chapel additions, plus converting an existing unused gymnasium into new science labs.

Grunau Location: Wisconsin Office

Owner: Marquette University

Contractor: CG Schmidt

Architect: Eppstein Uhen

Engineer: Grunau Company

Man-Hours: 20477

Case Study: Marquette University High School & Chapel Case Study

Completed: November 2008

When the insurance company expanded their Franklin Campus, Grunau once again stepped in to help with this Design/Assist project. Grunau completed installation and BIM design of HVAC, Plumbing, Fire Protection, and Grunau Metals / Specialty Metal Fabrication. Read the case study below for more info on this expansion project.

Grunau Location: Wisconsin Office

Owner: Northwestern Mutual

Contractor: Opus

Architect: Eppstein Uhen Architects

Engineer: Affiliated Engineers

Man-Hours: 55766

Case Study: Northwestern Mutual Phase II ~ Franklin Case Study

Completed: August 2008

BIM, HVAC, Underground Site Utilities, Grunau Metals, Specialty Metal Fabrication, Underground Utiltiies work for the 500,000 sq ft casino expansion and parking deck project

Grunau Location: Wisconsin Office

Owner: Forest County Potawatomi Community

Contractor: Gilbane

Architect: Hnedak BoBo Group

Man-Hours: 40783

Case Study: Potawatomi Bingo Casino Expansion Case Study

Completed: August 2008

Fire Protection Retrofit

Grunau Location: Wisconsin Office

Owner: Marquette University

Engineer: Grunau Company

Man-Hours: 4820

Completed: July 2008

Design/Build, Fire Protection

Grunau Location: Wisconsin Office

Owner: Hampton Inn & Suites

Contractor: American Design Build

Architect: American Design Build

Engineer: Grunau Company

Man-Hours: 951

Completed: May 2008

Design/Build, HVAC; LEED CS Silver rating in 2008

Grunau Location: Wisconsin Office

Owner: Irgens Development

Contractor: C.G. Schmidt, Inc.

Architect: PRA

Engineer: Grunau Company

Man-Hours: 4722

Completed: May 2008

Grunau Metals, Specialty Metal Fabrication and Structural Steel

Grunau Location: Wisconsin Office

Owner: Wind Shear Inc.

Contractor: JE Jacobs Technology, Inc.

Man-Hours: 12996

Completed: January 2008

HVAC, Temperature Controls, Equipment Recommission, Ongoing Service. In Dec 2007, Grunau installed PAC units and UPS systems in the data center. Grunau also completed ongoing maintenance and inspections of the facility’s HVAC equipment.

Grunau Location: Wisconsin Office

Owner: Metavante

Engineer: Miller Engineering

Man-Hours: 2878

Case Study: Metavante Data Center ~ Brown Deer Case Study

Completed: December 2007

Design/Build HVAC & Plumbing Replacement

Grunau Location: Wisconsin Office

Owner: Jewish Home & Care Center

Contractor: VJS Construction Services

Architect: Zimmerman Design Group

Engineer: Grunau Company

Man-Hours: 20672

Completed: November 2007

BIM, HVAC, and Electrical Temperature Controls completed on a 266,000 sq ft expansion to a gabled-roof hospital. Grunau continues the customer relationship with ongoing preventive Service and Maintenance at this medical facility. Read more about the expansion in the case study below.

Grunau Location: Wisconsin Office

Owner: Columbia St. Marys

Contractor: Mortenson Construction

Architect: HOK

Engineer: Ring & DuChateau

Man-Hours: 30349

Case Study: Columbia St. Marys ~ Ozaukee Case Study

Completed: July 2007

Grunau Metals, Specialty Metal Fabrication work in multi-use building including condominiums, guest suites, health club, and dining facilities.

Grunau Location: Wisconsin Office

Owner: University Club, LLC

Contractor: J.H. Findorff & Son, Inc.

Architect: Skidmore, Owings and Merrill, LLP

Man-Hours: 7721

Completed: June 2007

Design/Build, HVAC, Plumbing, Fire Protection, Underground Site Utilities, Temperature Controls (Electrical), Grunau Metals, Specialty Metal Fab; LEED NC Gold Rating in 2009

Grunau Location: Wisconsin Office

Owner: Riverbend Place LLC

Contractor: Gilbane Building Co.

Architect: Eppstein Uhen Architects

Engineer: STS Consultants

Man-Hours: 28721

Case Study: Manpower Corporate Headquarters Case Study

Completed: May 2007

Design/Build, HVAC, Temperature Controls, Electrical

Grunau Location: Wisconsin Office

Owner: Advanced Healthcare

Contractor: Midwest Design & Development

Engineer: Grunau Company

Completed: April 2007

Plumbing

Grunau Location: Wisconsin Office

Owner: Aurora Health Care

Contractor: Berghammer Corporation

Architect: Brubaker Architects

Engineer: Ring & DuChateau

Completed: January 2007

HVAC, Specialty Metals Fabrication, Plumbing and Medical Gas for the Medical College of Wisconsin/Children’s Research Institute. The 320,000 sq ft biomedical research facility includes laboratories and a live animal vivarium.

Grunau Location: Wisconsin Office

Owner: MCW/CRI

Contractor: Gilbane Building Co.

Architect: HGA

Engineer: BR+A

Man-Hours: 194148

Case Study: MCW/CRI Biomedical Research Facility Case Study

Completed: January 2007

Design/Assist, HVAC Including Further Development of Current Design

Grunau Location: Wisconsin Office

Owner: Irgens Development, LLC for Columbia St. Mary’s

Contractor: C.G. Schmidt, Inc.

Architect: HOK

Engineer: Affiliated Engineers

Man-Hours: 11645

Completed: December 2006

Grunau completed the Fire Protection installation at this facility and the customer’s testimonial below says it all.

Grunau Location: Wisconsin Office

Contractor: Burns McDonnell

Architect: Burns McDonnell

Testimonial: The fire protection system at the Flint Hills Resources Milwaukee Terminal offered some unique challenges to Grunau, and they performed exceptionally at every turn. The site restrictions and customer expectations could not have been any higher, and the Grunau personnel rose above the restrictions and led the effort to complete, commission, and train the Owner on a system that they were not familiar with. Performance specifications can often prove difficult with subcontractors that are not familiar with a design-build firm, but Grunau provided excellent services and delivered on their promise. It was a pleasure to have the opportunity to work with Eric Radke and the good people at Grunau. ~ Eric Kirchhofer, Project Manager Burns McDonnell

Completed: December 2006

Sitework & Fire Protection

Grunau Location: Wisconsin Office

Owner: Blood Center Research Institute

Contractor: M.A. Mortenson

Architect: HGA

Completed: November 2006

Design/Build Fire Protection, Underground Sitework, Plumbing & HVAC

Grunau Location: Wisconsin Office

Owner: Carma Labs

Contractor: J.H. Findorff & Sons

Engineer: Grunau Company

Completed: October 2006

Grunau Metals created flowing lines within the structural steel at the amphitheater over water. An artistic helical stair is a centerpiece inside the Discovery World interactive science museum.

Grunau Location: Wisconsin Office

Owner: Discovery World, Ltd.

Contractor: Gilbane Building Co.

Architect: HGA

Engineer: HGA

Man-Hours: 16971

Completed: September 2006

HVAC, Plumbing, Medical Gas, and Underground Utilties for 96,000 sq ft addition and 56,000 sq ft remodel of the existing hospital to bring it up to a 100-bed facility.

Grunau Location: Wisconsin Office

Owner: Fort Health Care

Contractor: JP Cullen & Sons

Architect: Plunkett Raysich Architects

Engineer: Affiliated Engineers

Completed: August 2006

HVAC for 400,000 sf redevelopment of existing concrete structure. Multi-use housing, university classrooms and retail space.

Grunau Location: Wisconsin Office

Owner: Weas Development for the UW – Milwaukee

Contractor: KBS Construction

Architect: HGA

Engineer: Grunau Company

Man-Hours: 28991

Completed: August 2006

HVAC system upgrade

Grunau Location: Wisconsin Office

Owner: Bucyrus International

Engineer: CEnergy/Grunau

Man-Hours: 12505.5

Completed: January 2006

Design/Build, HVAC

Grunau Location: Wisconsin Office

Owner: Irgens Development

Contractor: C.G. Schmidt, Inc.

Architect: Eppstein Uhen Architects

Engineer: Grunau Company

Completed: January 2006

Grunau installed HVAC, Plumbing, and Fire Protection systems in the field house addition at this uniquely designed school in Racine, WI

Grunau Location: Wisconsin Office

Contractor: Bukacek Construction, Inc

Architect: Zimmerman Design Group

Engineer: Grunau Company

Man-Hours: 12262

Case Study: Prairie School Case Study

Completed: November 2005

In a 2-phase computer room expansion project at Aurora Health Care’s corporate facility, Grunau installed a new glycol cooler system, fire suppression system, UPS unit and generator, plus Specialty Metals work including rooftop platforms, catwalks, railings and stairs.

Grunau Location: Wisconsin Office

Owner: Aurora Health Care

Contractor: Grunau Company

Architect: Grunau Company

Engineer: Grunau Company

Case Study: Aurora Health Care ~ Computer Room Expansion Case Study

Completed: May 2005

Design/Build, HVAC, Plumbing, Underground Site Utilities for Hartford office building

Grunau Location: Wisconsin Office

Owner: API Software

Contractor: KBS Construction

Architect: Excel

Engineer: Grunau Company

Completed: May 2005

Installed HVAC and plumbing systems at this 1.1 million sq ft grocery and wholesale distribution complex. Grunau Metals fabricated metal stairs, handrails, loading dock ramp railings, rooftop ladders, and sliding gate.

Grunau Location: Wisconsin Office

Owner: Pabst Farms

Architect: Opus Architectural & Engineering

Engineer: Grunau Company

Testimonial: “I really enjoyed working with Grunau Company because I didn’t have to worry about their quality work or whether they would finish on time. They knew the demanding schedule and completely exceeded any expectations.” ~ Dan Nash, Opus North Superintendent for Roundy’s Project

Completed: March 2005

When Northwestern Mutual built a new campus in the southern Milwaukee suburb of Franklin, Grunau was hired to install the plumbing and HVAC in the half-million sq ft office complex, including an underfloor system for high efficiency and cost effectiveness. Read the case study below for more details. Grunau also completed speciaty metals fabrication of handrails and stairs; see separate Grunau Metals Project entry to read that case study.

Grunau Location: Wisconsin Office

Owner: Northwestern Mutual

Contractor: Opus North Corporation

Architect: Eppstein Uhen

Engineer: Affiliated Engineers

Case Study: Northwestern Mutual: Mechanicals ~ Franklin Case Study

Completed: April 2004

Grunau Metals fabricated and installed specialty metals railings and stairs in the insurance company’s new half-million sq ft low-rise office building. Read the case study below for more information on this metals project. Grunau also completed HVAC and plumbing; see separate Mechanicals project entry to read the mechanical case study.

Grunau Location: Wisconsin Office

Owner: Northwestern Mutual

Contractor: Opus North Corporation

Architect: Eppstein Uhen Architects

Engineer: Affiliated Engineers

Case Study: Northwestern Mutual: Grunau Metals ~ Franklin Case Study

Completed: April 2004

Stairs and railings, Grunau Metals, Specialty metal fabrication at Edward Bain School of Language and Art

Grunau Location: Wisconsin Office

Owner: Kenosha Unified School District #1

Contractor: Riley Construction

Architect: Bray Associates Architects

Engineer: Ambrose Engineering, Inc.

Case Study: Riley Construction Case Study

Testimonial: “Grunau Metals did a great job. They made sure we had permanent stairs as soon as the second floor was erected – the way it should be done.” Tom Riley, President – Riley Construction

Completed: March 2004

HVAC work for a new cardiac center and patient tower

Grunau Location: Wisconsin Office

Owner: Aurora Health Care

Contractor: Boldt Construction

Architect: Kahler Slater Architects

Engineer: Ring & DuChateau

Case Study: St. Luke’s Heart Care Center and Patient Tower Case Study

Completed: March 2004

Service and maintenance – Grunau Company’s service and maintenance team was hired by Miller Brewing Company to repair an HVAC unit’s humidifier pan.

Grunau Location: Wisconsin Office

Owner: Miller Brewing Company

Case Study: Miller Brewing Company – Humidifier Pan Repair Case Study

Testimonial: “Grunau not only identified the problem of this badly corroded humidifier pan, but also suggested this cost effective and durable solution to what might have been a difficult replacement. It is innovative contributions like this that help solidify our partnership with Grunau.” Tom Blaedon, Corporate Facilities Manager – Miller Brewing Company

Completed: December 2003

1909 historic building renovated from an arena into a state-of-the-art theater and concert hall. Grunau completed specialty metal fabrication, staircases, catwalks, stage ladders and platforms. Also installed the HVAC, plumbing, and fire protection systems in this restoration project.

Grunau Location: Wisconsin Office

Owner: Wisconsin Center District

Contractor: GPD/Gilbane, Hunt

Architect: VOA Associates

Engineer: Nayyar & Nayyar Structural Engineers, IBC Engineering

Case Study: Milwaukee Theatre Case Study

Completed: November 2003

Engineering services, Grunau Metals and Specialty Metal Fabrication for soil and sediment washing machines. Read more in the case study below.

Grunau Location: Wisconsin Office

Owner: BioGenesis Enterprises, Inc.

Engineer: Grunau Metals and BioGenesis

Case Study: BioGenesis Enterprises, Inc. ~ Oak Creek Case Study

Testimonial: We chose Grunau Metals because they’re not a typical subcontractor. Instead, they are partners in our projects, helping us overcome the challenges and celebrating the successes. That’s the kind of cooperation and dedication we need. ~ Masood Amiran, BioGenesis Enterprises, Inc.

Completed: August 2003

Grunau Metals fabricated platforms for equipment installation at this medical facility. Read the case study for more details on this project.

Grunau Location: Wisconsin Office

Owner: Aurora Health Care

Case Study: St. Luke’s Hospital – Platform fabrication Case Study

Testimonial: Grunau Metals met our needs and helped us find the most effective solution to a unique challenge. They did an excellent job on the project. ~ Cherian Varghese, HVAC Supervisor, Aurora Health Care

Completed: June 2003

Grunau worked on plumbing and HVAC in each of the four tenanted office buildings in the Honey Creek business park near the Zoo Interchange and continues to service those buildings.

Grunau Location: Wisconsin Office

Owner: Opus North Corporation

Contractor: Opus North Corporation

Architect: Opus North Architects

Engineer: Grunau Company

Completed: May 2003

Service and maintenance – Rooftop air conditioning unit replacement

Grunau Location: Wisconsin Office

Owner: Wells Fargo

Case Study: Wells Fargo Case Study

Testimonial: “Grunau thought of an innovative way to complete this unique and complex project while respecting the businesses around our building. They were up to the challenge and really came through for Wells Fargo.” Bryant Carter, Service Technician – Wells Fargo

Completed: May 2003

HVAC, Plumbing

Grunau Location: Wisconsin Office

Owner: Columbia St. Mary’s

Contractor: Mortenson

Architect: Kahler Slater

Engineer: Ring & DuChateau

Man-Hours: 57915.51

Testimonial: “I just wanted to take a moment to thank you for the expertise and experience that you have brought to the project. Your ability, and the abilities of your team members, has been instrumental in identifying many conflicts and issues for construction.” Cindy Finstad, Project Manager – Mortenson

Completed: January 2003

HVAC

Grunau Location: Wisconsin Office

Contractor: Voss Jorgensen Schueler

Architect: Eppstein Uhen

Engineer: Grunau Company

Testimonial: “We are grateful for friends like you who support our mission.” Christine Burke-Duecker, Director of Development – School Sisters of St. Francis

Completed: January 2003

AHUs, Chillers

Grunau Location: Wisconsin Office

Owner: Archdiocese of Milwaukee

Contractor: GPD | Gilbane

Architect: Hammel, Green and Abrahamson

Engineer: Hammel, Green and Abrahamson

Man-Hours: 4103.25

Completed: January 2003

Installed HVAC systems including temperature controls for this southeastern Wisconsin hospital.

Grunau Location: Wisconsin Office

Owner: Waukesha Memorial Hospital

Contractor: CG Schmidt

Architect: Engberg Andersen

Engineer: Engineering Concepts

Completed: January 2003

Equipment setting, HVAC, process piping, ductwork, Grunau Metals and specialty metal fabrication for new special adhesive manufacturing facility

Grunau Location: Wisconsin Office

Owner: Nitto Denko

Contractor: Grunau Company

Engineer: Nitto Denko

Man-Hours: 47522

Completed: December 2002

Installed process piping, electrical, controls, and set brewery filter equipment

Grunau Location: Wisconsin Office

Owner: Miller Brewing Company

Completed: September 2002

Plumbing, HVAC, Medical gas system

Grunau Location: Wisconsin Office

Owner: Marquette University

Contractor: Boldt Construction

Architect: Kahler Slater

Engineer: Arnold & O’Sheridan

Man-Hours: 39047.65

Completed: August 2002

HVAC, Plumbing, Fire protection

Grunau Location: Wisconsin Office

Owner: State of Wisconsin

Contractor: Findorff Construction

Architect: Eppstein Uhen

Engineer: Grunau Company

Man-Hours: 35078.25

Completed: August 2002

Canopies, Stairwells, Railings, Grunau Metals, Specialty Metal Fabrication for bank and office space

Grunau Location: Wisconsin Office

Owner: Johnson Bank

Contractor: Mortenson

Architect: Eppstein Uhen Architects

Engineer: Pierce Engineers

Man-Hours: 16398.5

Case Study: Johnson Building Case Study

Testimonial: The Johnson Building is a reflection of how Grunau Metals consistently does business: focused on quality and respectful of our budget. It wasn’t a surprise that the team did a great job. ~ Scott Weas, Owner’s Representative for Johnson Bank – Weas Development

Completed: August 2002

HVAC, plumbing, and Grunau Metals: specialty metal fabrication for parking garage and chiller plant upgrade at remodeled retail store in tenant building

Grunau Location: Wisconsin Office

Owner: Wispark LLC

Contractor: GPD/Gilbane

Architect: Eppstein Uhen

Engineer: Grunau Company

Completed: June 2002

Grunau Metals, Specialty metal fabrication, Stairs, Railings

Grunau Location: Wisconsin Office

Owner: State of Wisconsin

Man-Hours: 7772

Completed: May 2001

New central supply air/exhaust systems, Plumbing to hoods, Fixtures and lab counter spaces

Grunau Location: Wisconsin Office

Owner: Marquette University

Contractor: Jens Construction

Architect: Holabird & Root

Engineer: Affiliated Engineers

Completed: April 2001

Plumbing, Sitework, Water feature

Grunau Location: Wisconsin Office

Owner: Milwaukee Art Museum

Contractor: CG Schmidt

Man-Hours: 11465

Testimonial: “I cannot tell you how impressed we were with the commitment and service from each and every one of your staff. Due to your outstanding efforts, Milwaukee now has what is clearly a world-class facility.” Steven G. Chamberlain, President – CG Schmidt, Inc.

Completed: January 2001

Plumbing, Fire protection, HVAC, Grunau Metals, Specialty metal fabrication, Snow melt system

Grunau Location: Wisconsin Office

Owner: Forest County Executive Council-Gaming Commission

Contractor: Sverdrup, CG Schmidt

Architect: Graef, Anhalt, Schloemer

Engineer: Ring & DuChateau

Completed: December 2000

Plumbing, Fire protection, and HVAC completed in the 18-story university residence hall when it was renovated from the “East Hall” and renamed as the “Straz Tower”.

Grunau Location: Wisconsin Office

Owner: Marquette University

Contractor: Hunzinger Construction

Architect: Eppstein Uhen

Engineer: Grunau Company

Completed: September 2000

Grunau Metals, Specialty metal fabrication, Stairs, Handrails, Canopy, Railings

Grunau Location: Wisconsin Office

Completed: January 2000

Grunau Metals, Specialty metal fabrication, handrails

Grunau Location: Wisconsin Office

Completed: January 2000

Process Piping, Plumbing, HVAC, Underground Site Utilities, Service and Maintenance. Grunau Company has provided mechanical services to Miller Brewing Company/MillerCoors for over 50 years. This broad range of services includes all mechanical installations in six new breweries, as well as continuous service to Milwaukee breweries.

Grunau Location: Wisconsin Office

Owner: MillerCoors

Case Study: Miller Brewing Company / MillerCoors Case Study

Testimonial: Grunau was involved in the construction of many of our buildings and their continued involvement in the day-to-day operations of the facility continues to benefit Miller. The relationship our companies have enjoyed over the years is a testimony to the trust factor we have established and the values we share. The personal involvement by Grunau’s management ensures a very high level of customer satisfaction. ~ Tom Blaedon, Corporate Facilities Manager at Miller

Completed: Ongoing for over 50 years