Since the 1920s, Grunau Fire Protection has set the standard for quality, reliability, and innovation in fire protection. Our Orlando branch brings that legacy to businesses across Central Florida, delivering complete fire protection services from concept to commissioning. We combine proven expertise, modern technology, and a collaborative approach to create lasting value for every customer.

Seven Dwarfs Mine Train

Grunau created a unique fire protection system by piping through the complexity of the rock work and down mulitple levels into the tunnels of this adventurous coaster ride in Fantasyland. Sprinkler heads were concealed with custom color eschuteons. A challenge on this project was getting materials into the park through one employee-shared access so it did not disrupt the normal buiness of the theme park.

Grunau Location: Florida Office

Engineer: Walt Disney Imagineering

Completed: May 2014

Nemours Children’s Hospital – Orlando

Fire protection work on the new state-of-the-art 6-story children’s hospital, clinic and central energy plant included 37 wet suppression systems, 3 dry systems, and 1 pre-action system. Grunau installed a sapphire clean agent fire suppression system for the data center, and 11 standpipes supplied by a new 1000 gpm variable frequency drive fire pump. 4300 sprinkler heads supported the combined 41 systems.

Grunau Location: Florida Office

Owner: The Nemours Foundation Professional Coporation

Architect: Stanley, Beaman & Sears

Completed: January 2013

Fantasyland – Bay Lake

When Disney World Orlando planned their largest expansion in the history of the park with the new Fantasyland, they relied on Grunau’s attention to detail and design experience. Fire protection pipes rans through wooden beams to conceal sprinklers and sprinkler heads were covered with colored eschuteons throughout the park, including 16 custom colors concealed in the ballroom ceiling mural of the Be our Guest Restaurant.

Grunau Location: Florida Office

Engineer: Walt Disney Imagineering

Completed: November 2012

Legoland Florida

Grunau completed 4 new wet systems, 1 dry system and 1 anti-freeze fire protection system during the renovation of the 145-acre outdated park when it became a new state of the art theme park made from Legos. Grunau successfully completed this project within an agressive schedule. Legoland Florida is the world’s second largest Legoland park after Legoland Windsor in England.

Grunau Location: Florida Office

Owner: Lego Group, Merlin Entertainment Group

Completed: September 2011

Peabody Hotel

Grunau installed the sprinklers in this new 34 story hotel and 2-story convention center. Also installed 2 new fire pumps underground per the fire protection drawings. This hotel was later purchased by Hyatt Hotels in 2013.

Grunau Location: Florida Office

Owner: Peabody Hotel

Contractor: Balfour Beatty Construction

Completed: November 2010

Port Orleans – Lake Buena Vista

Port Orleans is a popular hotel at Walt Disney World in Florida, famous for its Louisiana flair. When park officials discovered existing fire protection piping on the hotel’s roof was beginning to corrode, they called Grunau to resolve. Original black steel piping and fittings were replaced with stronger galvanized steel. Grunau swapped out nearly a mile of piping across all 7 buildings that make up the Port Orleans hotel complex and coordinated work to keep the hotel fully-operational.

Grunau Location: Florida Office

Owner: Walt Disney World

Testimonial: They exceeded my expectations of how a contractor should perform. They were dedicated to getting the work done from the start. All these guys have my utmost gratitude for a great job. ~ Eddie Hendrix of Disney’s facility asset management

Completed: January 2010

Strong Arm – the Facility – Orlando

Project Strong Arm, also known as the Wizarding World of Harry Potter, involved a lot of design coordination when Grunau installed the 1 dry pipe system, 4 wet pipe systems, 2 electric fire pump systems and limited underground work at the theme park attraction. Sprinkler drops were laid out and installed without a ceiling in place, then the framing and drywall were attached, followed by the theming contractors’ wood slats and beams. Several of the rooms have high ceilings and small doorways so reaching construction areas was challenging. Grunau worked with the Universal Studios Creative team to coordinate sprinklers with ceiling finishes.

Grunau Location: Florida Office

Owner: Universal City Development Partners, Ltd

Architect: Post Buckley Schuh & Jernigan, Inc

Completed: December 2008

Catoca Diamond Mine – Angola Africa

Grunau’s Orlando, FL fire protection shop fabricated an aqueous film-forming (AFFF) system to protect the Catoca diamond mine in Angola, Africa. The system was designed by Grunau without seeing the physical site and once approved and fabricated, the system’s individual components were shipped to Africa. Paskor Holdings in Orlando (a Grunau client) assumed responsibility for constructing the fire protection system at the African mine.

Grunau Location: Florida Office

Completed: November 2008

Festival Bay Mall (Artegon Marketplace)

Designed, fabricated and installed 6,500 sprinklers, 46 Hose stations, and 1,000 GPM fire pump at this enclosed shopping mall

Grunau Location: Florida Office

Contractor: Beck Construction

Completed: January 2003

Agricultural Center Project

Installed 4,000 sprinklers, 1000 GPM fire pump in arena and exhibition facility

Grunau Location: Florida Office

Owner: Osceola County

Contractor: Centrex Rooney, Gray Construction

Completed: January 2003

Performing Arts Center Project

Installed 5 Standpipes and 1250 GPM Fire Pump at the 10,000 sq ft facility within the Bethune-Cookman University campus

Grunau Location: Florida Office

Contractor: Stellar Group

Completed: January 2003

Gaylord Palm Hotel & Convention Center

Installed 20,000 Sprinklers, 81 Wet systems, Dry system, Preaction system, and 225,000 feet of fire protection piping

Grunau Location: Florida Office

Owner: Gaylord Entertainment

Contractor: Perini, Suitt

Completed: January 2002

Bloomingdales Orlando

Installed 2,000 Sprinklers and 1250 GPM Fire Pump to protect the employees, customers, merchandise and department store facility

Grunau Location: Florida Office

Owner: Federated Department Stores

Completed: January 2002